Schaerbeek - rue Scutenaire
construction of a block of flats - 12 social housing units
- Contracting authority: SLRB Société du Logement de la Région de Bruxelles Capitale
- Structural engineeering and equipment: Delta GC sa (Liège) consulting engineers
- Study for thermal solar installation and energy audit: bureau 3E
- Site: main contractor
- 600 calendar days - building completed in May 2009
- Construction cost: 2,212,527 € ex. vat + 24,530 € for solar installation